EYP & SCPA Technology Services Clients
Home Contact
Localization:
News: News Archive
Human Resources
 
Work with us now:
NEWS ARCHIVE Previous
12/01/2010
EYP SCAP carry out the installation of control and supervisory system in the Rañadoiro Tunnel.
EYP SCAP carries out the installation of control and supervisory system in the Rañadoiro Tunnel on the AS-15 road belonging to the Principado de Asturias network. This tunnel is a bidirectional one having 1.924 mts long. This tunnel has solved the communications between Rengos and Larón specially in winter time when the old pass through the Rañadoiro port has been traditionally broken by the snow.
This tunnel has all the security system requested by the europen directive like Radio Messages, Automatic Incident Detector for video, etc.
 
© 2008 EYP SCAP | All right reserved | Legal Advice | Personal Data Protection